PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block Work at the detention cells Facing West.jpg Core Drilled at Stair -2 2.jpg Installing Stone panel at the 1st floor East Elevation.jpg Installing Stone panels at the East Elevation 1.jpg Installing Stone panels at the East Elevation 2.jpg Laying out block at the 1st floor EMR Room Facing South.jpg Erecting the stone panels at the East Elevation.jpg Installed duct work hangers at the 4th floor Facing North.jpg Installing Sheathing at the 4th floor Electical Room Facing West.jpg
Previous pageNext page Installing Stone panels at the East Elevation 2
Installing Stone panels at the East Elevation 2